Patent · US Expired

Stochastic priority-based task scheduler

US5247677A · kind A · utility

87Cited by
2References
7Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 22, 1992
Grant dateSep 21, 1993
Priority date
Expiry dateMay 22, 2012

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/4881
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A stochastic priority based scheduler for selecting executable tasks in a computer system is disclosed. The stochastic priority based scheduler selects tasks on the basis of a random number weighted by task priority. Since every task has a nonzero finite probability of being selected, the probability being proportional to the task priority, all tasks, even low priority ones, have a chance of being selected, thus eliminating the lockout problem.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.