Method for resource allocation and project control for the production of a product

US5291397A · kind A · utility

82Cited by
8References
6Claims
0Family size

Inventor

Key dates

Filing dateDec 20, 1991
Grant dateMar 1, 1994
Priority date
Expiry dateDec 20, 2011

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/06
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A control system for the manufacture of a product is disclosed. A network of events and activities and a baseline schedule is constructed. Actual and predicted deviations to the baseline schedule, which are called slack variables, are used to predict the actual final completion date, using parallel processing. These slack variables are also used to selectively allocate resources to elements of the manufacturing process. Critical elements and critical dates are readily determined. The incremental cost of incremental schedule improvement can be readily determined. The current status of a project can be described in a single variable.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.