Control methods and valve arrangement for start-up and shutdown of pressurized combustion and gasification systems integrated with a gas turbine
US5309707A · kind A · utility
Assignee
Inventors
Key dates
| Filing date | Mar 12, 1993 |
| Grant date | May 10, 1994 |
| Priority date | — |
| Expiry date | Mar 12, 2013 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E20/18
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
A power plant having a system for converting coal to power in a gas turbine comprises a coal fed pressurized circulating bed for converting coal to pressurized gases, a gas turbine having a compressor for pressurizing air for the pressurized circulating bed and expander for receiving and expanding hot combustion gases for powering a generator, a first fast acting valve for controlling the pressurized air, a second fast acting valve means for controlling pressurized gas from the compressor to the expander.