Patent · US Expired

Method for the construction of long tunnel with a lining

US5324139A · kind A · utility

11Cited by
2References
15Claims
0Family size

Assignees

Inventors

Key dates

Filing dateFeb 18, 1993
Grant dateJun 28, 1994
Priority date
Expiry dateFeb 18, 2013

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21D9/0609
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A new combination of means and method steps is used in a method of constructing long tunnels with a lining, wherein excavation is effected with a tunnel boring machine (1) with a yielding shield mantle (4), building is effected continuously under the protection of the shield tail in a modular construction with tubbing stones of a special form complementing each other to form tubbing rings (15) while, until a new equilibrium of the rock formation is reached, occurring deformation forces are absorbed by the shield tail (4) and the tubbing rings which are yieldingly constructed to a limited degree, an outer seal of the tubes is provided and the gap between the excavation (2) and the tunnel tubes is filled with a material (22) which may be yielding to a limited extent to absorb long-time deformation forces. A tunnel construction made by the method, special forms of tubbing stones and new embodiments of drive means for the tunnel are disclosed.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.