Method for the construction of long tunnel with a lining
US5324139A · kind A · utility
Assignees
Inventors
Key dates
| Filing date | Feb 18, 1993 |
| Grant date | Jun 28, 1994 |
| Priority date | — |
| Expiry date | Feb 18, 2013 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21D9/0609
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A new combination of means and method steps is used in a method of constructing long tunnels with a lining, wherein excavation is effected with a tunnel boring machine (1) with a yielding shield mantle (4), building is effected continuously under the protection of the shield tail in a modular construction with tubbing stones of a special form complementing each other to form tubbing rings (15) while, until a new equilibrium of the rock formation is reached, occurring deformation forces are absorbed by the shield tail (4) and the tubbing rings which are yieldingly constructed to a limited degree, an outer seal of the tubes is provided and the gap between the excavation (2) and the tunnel tubes is filled with a material (22) which may be yielding to a limited extent to absorb long-time deformation forces. A tunnel construction made by the method, special forms of tubbing stones and new embodiments of drive means for the tunnel are disclosed.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.