Cyclic maintenance work schedule table preparation system
US5343387A · kind A · utility
Assignees
Inventors
Key dates
| Filing date | Nov 27, 1991 |
| Grant date | Aug 30, 1994 |
| Priority date | — |
| Expiry date | Nov 27, 2011 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/063112
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A system is provided for the preparation of a cyclic maintenance work schedule table. The system includes a display unit which can show boxes defined by dates in a desired period and the names of individual workers. The system also has a worker data memory for storing scheduled work information of the individual workers during the period and work qualifications of the individual workers; a building data memory for storing the names, work details, last working dates, and contracted frequencies of maintenance work of buildings to be worked with during the period; a processor for deciding working dates in the period for the buildings stored in the building data memory; and another processor for allocating the names of the buildings in the descending order of the difficulty of work items on the basis of data - which have been obtained from the worker data memory, building data memory and working date deciding means - and, after one of the boxes has been filled with a predetermined working time, moving to another one of the boxes.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.