Installation for producing molten metal in an electric furnace
US5390212A · kind A · utility
Assignee
Inventors
Key dates
| Filing date | Aug 6, 1992 |
| Grant date | Feb 14, 1995 |
| Priority date | — |
| Expiry date | Aug 6, 2012 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P10/20
- WIPO fieldThermal processes and apparatus
- WIPO sectorMechanical engineering
Abstract
Installation for producing steel by melting scrap comprising an electric furnace (2') supplied with individual batches of scrap sequentially charged into the furnace after preheating in a preheating chamber (4) forming a batch container open at both ends and having a releasable bottom. The preheating chamber is mounted on a transporting device for movement between a first, preheating position, in which it is connected to a hot gas circulating circuit, and a second position in which it empties the batch of preheated scrap into the furnace. The lower portion of the side wall of the preheating chamber (4) forms a skirt (43) with a wide downwardly directed opening, and the chamber (4) is combined, in the preheating position, with a movable device (54) for sealably engaging the lower end (42) of the skirt (43) with a matching stationary base plate (3), whereby the skirt is sealed in the preheating position.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.