Patent · US Expired

Installation for producing molten metal in an electric furnace

US5390212A · kind A · utility

8Cited by
4References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 6, 1992
Grant dateFeb 14, 1995
Priority date
Expiry dateAug 6, 2012

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P10/20
  • WIPO fieldThermal processes and apparatus
  • WIPO sectorMechanical engineering

Abstract

Installation for producing steel by melting scrap comprising an electric furnace (2') supplied with individual batches of scrap sequentially charged into the furnace after preheating in a preheating chamber (4) forming a batch container open at both ends and having a releasable bottom. The preheating chamber is mounted on a transporting device for movement between a first, preheating position, in which it is connected to a hot gas circulating circuit, and a second position in which it empties the batch of preheated scrap into the furnace. The lower portion of the side wall of the preheating chamber (4) forms a skirt (43) with a wide downwardly directed opening, and the chamber (4) is combined, in the preheating position, with a movable device (54) for sealably engaging the lower end (42) of the skirt (43) with a matching stationary base plate (3), whereby the skirt is sealed in the preheating position.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.