Automated steam turbine startup method and apparatus therefor
US5433079A · kind A · utility
Assignee
Inventors
Key dates
| Filing date | Mar 8, 1994 |
| Grant date | Jul 18, 1995 |
| Priority date | — |
| Expiry date | Mar 8, 2014 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG05B13/0275
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
A method for automated control of a steam turbine prewarming procedure employs fuzzy logic to generate a control signal for a turbine regulatory function, such as steam supply. The method includes the steps of determining a plurality of turbine condition parameter signals; generating a plurality of regulatory control directions; generating a weighting factor to be assigned to each of said regulatory control directions by means of a fuzzy inference calculation in accordance with an operator-selected fuzzy logic profile, and applying the weighting factors to the regulatory control directions to produce the turbine regulatory function control signal. The turbine regulatory function control signal is applied to a respective function controller in the steam plant such that the selected turbine prewarming profile is implemented.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.