Patent · US Expired

Method and system for production planning

US5586021A · kind A · utility

89Cited by
8References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 24, 1992
Grant dateDec 17, 1996
Priority date
Expiry dateMar 24, 2012

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/80
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A method for planning a production schedule within a factory is disclosed herein. A capacity model is determined for the factory. The capacity model is determined by determining a plurality of contiguous time intervals, partitioning the factory into a plurality of resource groups, and determining a processing capacity for each of the resource groups for each of the time intervals. For each job to be planned, the job is divided into a plurality of processing segments each of which is represented with a corresponding fuzzy set. The fuzzy set representations are inserted and removed within the capacity model until the job is planned. A completion date and a confidence level can be predicted for each of the jobs. In addition, the jobs may be released to the factory and devices fabricated according to the requirements of the jobs. Other systems and methods are also disclosed.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.