Scheduling system and method
US5623413A · kind A · utility
189Cited by
25References
50Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Sep 1, 1994 |
| Grant date | Apr 22, 1997 |
| Priority date | — |
| Expiry date | Sep 1, 2014 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY10S706/932
- WIPO fieldTransport
- WIPO sectorMechanical engineering
Abstract
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.