Patent · US Expired

Process control of compacted graphite iron production in pouring furnaces

US5758706A · kind A · utility

1Cited by
3References
12Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 1, 1996
Grant dateJun 2, 1998
Priority date
Expiry dateJul 1, 2016

Classification

  • Technology area (CPC C)Chemistry; Metallurgy
  • CPC primaryC21C1/105
  • WIPO fieldMaterials, metallurgy
  • WIPO sectorChemistry

Abstract

A method for continuously providing pretreated molten iron for casting objects which solidify as compacted cast iron, in which inoculating agents are added immediately prior to casting, in exact quantities. In practicing the method, the ability of the fully treated cast iron to crystallize is measured and the result of this measurement is used for feedback control of the supply of inoculating agent, this supply being effected at the last possible stage of the treatment process, so as to optimize the amount of inoculating agent introduced to the system. Since the inoculating a gent will normally include FeSi, it will also fed back and used to increase or reduce the addition of agents for adjusting the carbon and/or silicon contents of the iron as necessary.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.