Patent · US Expired

Method of scheduling successive tasks

US5826080A · kind A · utility

66Cited by
0References
2Claims
0Family size

Assignee

Inventor

Key dates

Filing dateAug 2, 1995
Grant dateOct 20, 1998
Priority date
Expiry dateAug 2, 2015

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/4887
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method of scheduling tasks subject to timing and succession constraints essentially comprises grouping the tasks in layers according to succession constraints and scheduling the tasks layer by layer in increasing layer order up to the last layer, if possible, and then deciding that the resulting scheduling succeeds. If the scheduling achieved in a layer other than the first layer does not satisfy one or more constraints applying to a task belonging to the current layer, the method reschedules a layer containing a predecessor task corresponding to an unsatisfied constraint, schedules or reschedules all the other layers higher than the layer of the predecessor task, up to the last layer, if possible, and then decides that the resulting scheduling succeeds. Applications include scheduling of transmission of information on an industrial data bus.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.