Patent · US Expired

Projected supply planning matching assets with demand in microelectronics manufacturing

US6049742A · kind A · utility

96Cited by
4References
7Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 26, 1997
Grant dateApr 11, 2000
Priority date
Expiry dateSep 26, 2017

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/80
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A computer-implemented decision-support tool serves as a solver to generate a projected supply planning (PSP) or estimated supply planning (ESP) match between existing assets and demands across multiple manufacturing facilities within the boundaries established by the manufacturing specifications and process flows and business policies to determine what supply can be provided over what time-frame by manufacturing and establishes a set of actions or guidelines for manufacturing to incorporate into their manufacturing execution system to ensure that the delivery commitments are met in a timely fashion. The PSP or ESP tool resides within a data provider tool that pulls the required production and distribution information. PSP matching is driven directly by user-supplied guidelines on how to flow or flush assets "forward" to some inventory or holding point. After the supply plan is created, the analyst compares this plan against an expected demand profile.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.