Patent · US Expired

Segmented brake pipe train control system and related methods

US6095618A · kind A · utility

41Cited by
8References
33Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 19, 1999
Grant dateAug 1, 2000
Priority date
Expiry dateMar 19, 2019

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02T90/16
  • WIPO fieldTransport
  • WIPO sectorMechanical engineering

Abstract

A train control system is for a train comprising at least first and second train segments including a brake pipe being separated between adjacent train segments. The train control system preferably comprises a first control subsystem for installation in a locomotive of the first train segment and a second control subsystem for installation in a locomotive of the second train segment. The first and second control subsystems communicate with one another for controlling train braking. The system also preferably includes a third control subsystem for installation in a railcar adjacent an end of the first train segment. This third control subsystem preferably includes at least one pressure transducer for sensing brake pipe pressure adjacent the end of the first train segment, and at least one control valve for controlling brake pipe pressure adjacent the end of the first train segment. The third control subsystem also preferably includes a processor for communicating a signal related to brake pipe pressure adjacent the end of the first train segment to the second control subsystem, and for controlling brake pipe pressure adjacent the end of the first train segment responsive to a comman…

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.