Resource management in a clustered computer system
US6151688A · kind A · utility
Assignee
Inventors
Key dates
| Filing date | Feb 14, 1998 |
| Grant date | Nov 21, 2000 |
| Priority date | — |
| Expiry date | Feb 14, 2018 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/008
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Methods, systems, and devices are provided for managing resources in a computing cluster. The managed resources include cluster nodes themselves, as well as sharable resources such as memory buffers and bandwidth credits that may be used by one or more nodes. Resource management includes detecting failures and possible failures by node software, node hardware, interconnects, and system area network switches and taking steps to compensate for failures and prevent problems such as uncoordinated access to a shared disk. Resource management also includes reallocating sharable resources in response to node failure, demands by application programs, or other events. Specific examples provided include failure detection by remote memory probes, emergency communication through a shared disk, and sharable resource allocation with minimal locking.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.