Patent · US Expired

Method of operation of industrial gas turbine for optimal performance

US6226974A · kind A · utility

45Cited by
5References
10Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 25, 1999
Grant dateMay 8, 2001
Priority date
Expiry dateJun 25, 2019

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E20/16
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A gas turbine operational strategy is provided for the optimization of ISO-Day rated performance. The invention is realized by setting the nominal operating line equal to or slightly below the operating limit line, so that ISO full load performance is maximized. Thus, the first stage turbine nozzle throat area is sized such that, without inlet bleed heat addition, and at Base-Load pressure ratio and firing temperature, the compressor operates within its operational limits on a ISO day. As ambient conditions change, levels of inlet bleed heat and firing temperature are controlled and the inlet guide vane angle is set whereby the nominal operating line is equal to or slightly below the operating limit line.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.