Patent · US Expired

Hydroelectric installation and method of constructing same

US6281597A · kind A · utility

25Cited by
6References
17Claims
0Family size

Assignees

Inventors

Key dates

Filing dateAug 13, 1999
Grant dateAug 28, 2001
Priority date
Expiry dateAug 13, 2019

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P70/50
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A hydroelectric power installation including a pre-existing gated spillway with upstream bulkhead slots and bulkhead service crane and hydroelectric generating modules configured to fit the existing upstream bulkhead slots. Each module including a plurality of turbines, generators, and associated switchgear. The installation may include a trash rake operated on the pre-existing bulkhead service craneway. The hydroelectric installation is configured to meet all of the original navigation project design criteria including generating modules that can be raised above flood water as high as the associated radial gates and that are able to be safely lowered in front of a failed radial gate to serve as the emergency bulkhead the slots for which the modules exclusively occupy.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.