Building foundation using pre-cast concrete elements
US6314693A · kind A · utility
Assignee
Inventor
Key dates
| Filing date | Sep 25, 2000 |
| Grant date | Nov 13, 2001 |
| Priority date | — |
| Expiry date | Sep 25, 2020 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE02D27/02
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A building foundation is formed by a plurality of pre-cast concrete elements. Each of the pre-cast elements has a length corresponding to the length of a corresponding side or leg of the foundation perimeter. The foundation includes a plurality of pre-cast concrete footing pads that are dispersed along the perimeter and specifically at the corners of the foundation. The pre-cast foundation elements rest on the footing pads and are contiguously arranged to complete the foundation. A bonding agent can be introduced into the joints between adjacent foundation elements to seal the joint. Alternatively, or in addition, mechanical fasteners can be used to interconnect adjacent panels. Certain ones of the pre-cast foundation elements define an integral brick ledge, with varying configurations to ensure continuity of the brick ledge around the corners of the foundation. In a method of the invention, a trench around the perimeter is dug and the pre-cast concrete elements laid in place with a crane.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.