Backfilling underground voids

US6322292A · kind A · utility

3Cited by
6References
10Claims
0Family size

Inventors

Key dates

Filing dateJan 29, 1998
Grant dateNov 27, 2001
Priority date
Expiry dateJan 29, 2018

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02W30/91
  • WIPO fieldMaterials, metallurgy
  • WIPO sectorChemistry

Abstract

A method for filling an underground void, such as a mine stope, without danger of causing mud slides therein, with the material being pumped from a site which is located remote from the void. A fluid, cementitious material is formed by mixing hydraulic cement, water, particulate solid material, and foam material. The bubble structure which results from incorporating the foam constituent in the fill material renders this much more fluid and pumpable, thereby allowing the use of much higher solids-to-water ratios than would otherwise be possible while still being able to pump the material over significant distances. This reduces the possibly of fluidic collapse of the material in the void, and produces other advantages as well. In the case of stopes, the particulate solid component is ordinarily provided using the tailings from the mine operation.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.