Patent · US Expired

Method and systems for a graphical real time flow task scheduler

US6323882A · kind A · utility

33Cited by
4References
14Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 17, 1998
Grant dateNov 27, 2001
Priority date
Expiry dateNov 17, 2018

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10S715/965
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

A system and method of creating and using a graphical task scheduler. A Graphical User Interface (GUI) allows a user to graphically build a real time flow task scheduler by providing a "click & drag" functional palette which contains graphical flow chart elements. By creating this graphical flow chart, the user is able to associate a plant layout, or any subpart of the entire plant, to its associated mathematical model. With a graphical flow chart, the user can define one or more exit branches for each task. For tasks with more than one exit branch, the user can specify the conditions causing the sequence to use each branch. Once the flow chart is set up, it can be used as a sequence editor or scheduler. The sequence editor defines the sequence of tasks that will be performed by an on-line application, such as optimization, and also allows scheduling of the on-line application at specific times or periodic intervals. The scheduler controls the running of each sequence based on the scheduling information. Once a plant has been optimized by the graphical task scheduler, the optimized data may be used to control plant operations.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.