Patent · US Expired

Cross application time sheet for communicating with one or more enterprise management applications during time data entry

US6338097B1 · kind B1 · utility

123Cited by
16References
56Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 19, 1998
Grant dateJan 8, 2002
Priority date
Expiry dateJun 19, 2018

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/1091
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A data model for a supply chain is provided whereby individual working steps in a production process are defined as activities, and organized groups of such activities are defined as orders. Activities are allocated to no more than one resource and contain information concerning the start and finish time for the activity, any resource on which the activity is currently scheduled, and a list of alternative resources, if any. Activities are linked to each other via auxiliary objects, which contain information concerning the minimum and maximum time between activities. Orders may contain input and/or output interface nodes, representing the materials consumed and produced by the offer. Each output interface node representing a quantity of material created from one order is linked via an auxiliary object to respective input interface node or nodes from other orders that are scheduled to receive that material. Order anchors are defined whereby a planning algorithm can easily reference an order by its order number in a database table. Planning object anchors allow the planning algorithm to access all the orders for a given material, and resource anchors permit access to all activities sc…

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.