Patent · US Expired

Resource management in a clustered computer system

US6338112B1 · kind B1 · utility

179Cited by
46References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 18, 2000
Grant dateJan 8, 2002
Priority date
Expiry dateMay 18, 2020

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F11/008
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Methods, systems, and devices are provided for managing resources in a computing cluster. The managed resources include cluster nodes themselves, as well as sharable resources such as memory buffers and bandwidth credits that may be used by one or more nodes. Resource management includes detecting failures and possible failures by node software, node hardware, interconnects, and system area network switches and taking steps to compensate for failures and prevent problems such as uncoordinated access to a shared disk. Resource management also includes reallocating sharable resources in response to node failure, demands by application programs, or other events. Specific examples provided include failure detection by remote memory probes, emergency communication through a shared disk, and sharable resource allocation with minimal locking.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.