Method for rapid startup and increase in output of a gas turbine plant

US6378285B1 · kind B1 · utility

6Cited by
8References
12Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 13, 2000
Grant dateApr 30, 2002
Priority date
Expiry dateJan 13, 2020

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E20/16
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

The startup time or the output gradient of a gas turbine plant during startup are limited by the maximum permissible temperature gradient. The increase in the fuel mass flow supplied, if appropriate in combination with the combustion-air mass flow supplied, is consequently also limited. In order to accelerate the startup and to increase the output gradient during startup, then, an additional working medium, for example water or steam, increasing the mass flow flowing through the turbine is supplied at the same time as the fuel mass flow and/or combustion-air mass flow. The output gradient is therefore increased with the maximum permissible temperature gradient remaining the same, so that a required output is reached more rapidly.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.