Overfilled, precast skewed arch bridge

US6434892B1 · kind B1 · utility

7Cited by
3References
33Claims
0Family size

Inventor

Key dates

Filing dateMar 7, 2000
Grant dateAug 20, 2002
Priority date
Expiry dateMar 7, 2020

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE01D2101/26
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

An overfilled, pre-cast reinforced concrete arch bridge for supporting one pathway above a second pathway in which the projections of the pathways intersect at an oblique angle. The bridge includes a plurality of identically shaped arch elements that are offset from each other to form a staggered orientation whereby a skewed bridge is formed without specially shaped arch elements. Cover elements can be used to prevent migration of soil or water into the bridge and various forms of arch elements can be used in the bridge.