Patent · US Expired

Pluggable resource scheduling policies

US6457008B1 · kind B1 · utility

46Cited by
7References
23Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 28, 1998
Grant dateSep 24, 2002
Priority date
Expiry dateAug 28, 2018

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/524
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

One embodiment of the present invention provides a resource scheduler for allocating a computer system resource, such as execution time within a processor, to database management system (DBMS) processes. The resource scheduler operates according to scheduling plans and policies. One or more plans may be configured and loaded with the DBMS. Each plan allocates the resource according to an associated policy but only one plan is active at a time. During operation of the DBMS, either or both of the active plan and policy may be exchanged for an alternate plan or policy without halting operation of the DBMS or the computer system.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.