Patent · US Expired

Progressive production methods and system

US6508308B1 · kind B1 · utility

21Cited by
15References
14Claims
0Family size

Assignee

Inventor

Key dates

Filing dateSep 26, 2000
Grant dateJan 21, 2003
Priority date
Expiry dateDec 5, 2020

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/128
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

Methods for staged production from a wellbore include pumps sequentially operated during the life of the well. In described embodiments, production assemblies are used for progressive staged production process in which the production tubing is bifurcated to provide a pair of legs. One of the legs includes a first pump that may be selectively actuated to flow fluid through one of the legs. Means are also provided, including a sliding sleeve and a flapper valve diverter, for blocking production fluid flow through one leg or the other. A second fluid pump is lowered inside of the production tubing to pump fluid after the first pump has failed.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.