Method for analyzing a completion system
US6526819B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Feb 8, 2001 |
| Grant date | Mar 4, 2003 |
| Priority date | — |
| Expiry date | Feb 8, 2021 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B47/007
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
The present invention provides a method for analysing a well completion system, wherein the method includes receiving data representative of physical characteristics of the completion system and calculating a first change in length of a tube string resulting from a helical buckling effect. The method further includes calculating a second change in length of the tube string resulting from a ballooning effect and calculating a third change in length of the tube string resulting from a slackoff force effect. Upon completion of the calculating steps, the method may output predetermined results therefrom.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.