Patent · US Expired

Generated system bottoming cycle

US6539720B2 · kind B2 · utility

89Cited by
12References
51Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 6, 2001
Grant dateApr 1, 2003
Priority date
Expiry dateNov 6, 2021

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF02C6/18
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A closed loop Rankine bottoming cycle including a heat exchanger coupled to an exhaust port of a first turbogenerator for heating a pressurized refrigerant into a gaseous phase, and a second turbogenerator (e.g., a turbo expander) coupled to the heat exchanger for expanding the gaseous phase so as to create power. Also included is a cooling mechanism coupled to an exhaust of the second turbogenerator for cooling the gaseous phase exhausted by the second turbogenerator into a liquid phase, and a pumping mechanism for pressurizing the liquid phase into the pressurized refrigerant heated by the heat exchanger. A computer program product and method for operating and synchronizing the generator included in the closed loop, so as to optimize the overall system efficiency is also included.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.