Patent · US Expired

System and method for providing ballast loading for a turbo-generator

US6545373B1 · kind B1 · utility

34Cited by
10References
25Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 24, 2001
Grant dateApr 8, 2003
Priority date
Expiry dateAug 24, 2021

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02T50/60
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

A ballast load control system and method is presented that regulates the output electrical power supplied by a turbo-generator such that appropriate turbine loading may be achieved. Such enables the use of a turbo-generator having an expansion turbine to be used to provide a controlled, required amount of cooling to a thermal control system. By effectively varying the coupled electrical load, the loading provided to the expansion turbine may be controlled while maintaining output power requirements to connected electrical utilization equipment. Use of a common system controller for both the cooling system and ballast trim load system of the present invention ensures coordinated operation between the required amount of cooling and electrical power quality supplied to the coupled utilization equipment.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.