Patent · US Expired

System and methods for scheduling manufacturing resources

US6591153B2 · kind B2 · utility

38Cited by
10References
64Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 12, 2001
Grant dateJul 8, 2003
Priority date
Expiry dateOct 25, 2021

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/06
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A system and method for scheduling manufacturing resources based on user defined scheduling and routing goals. Attributes and constraints may be assigned to manufacturing resources and SKUs that facilitates the planning and scheduling of the resources. Resource transitions may be restricted only to desirable transition by using product wheels. Excess work-in-process may be minimized by scheduling orders that consume the excess work-in-process.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.