Patent · US Expired

System and method for monitoring a reservoir and placing a borehole using a modified tubular

US6614229B1 · kind B1 · utility

70Cited by
12References
51Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 27, 2000
Grant dateSep 2, 2003
Priority date
Expiry dateMar 27, 2020

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B47/16
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

Systems and methods for monitoring a characteristic of a subterranean hydrocarbon reservoir and for placing a borehole in the vicinity of a well in an earth formation. New well completion systems with slotted stations are utilized to provide through-casing signal-transmission and/or reception. Hydraulic isolation between the interior and the exterior of the completion is provided by pressure barrier means at the slotted stations. The completions permit temporary or permanent monitoring of changes in reservoir saturation with the use of mobile sources/sensors. The completions also form part of a system for accurately placing a well within a desired distance and orientation relative to an existing well.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.