Patent · US Expired

System and method for operating electric power systems utilizing optimal power flow

US6625520B1 · kind B1 · utility

43Cited by
0References
9Claims
0Family size

Assignees

Inventors

Key dates

Filing dateMay 31, 2000
Grant dateSep 23, 2003
Priority date
Expiry dateDec 23, 2021

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S40/20
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

There is provided an available transfer capability calculating system for operating an electric power system, calculating optimal power flow with respect to assumption failure occurring in the electric power system and calculating available transfer capability of the electric power system based on the calculated value of the optimal power flow. The system has an optimal power flow calculating processor for deriving data associated with the initial phase angle and maximum electric power value of a generator by calculating mechanical output and electrical output of a generator including a generator phase angle defined by a time function in a condition that the generator phase angle does not exceed a preset value.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.