Method for managing urban wastewater based on indications on pollutants
US6656367B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Apr 25, 2002 |
| Grant date | Dec 2, 2003 |
| Priority date | — |
| Expiry date | Apr 25, 2022 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY10S210/908
- WIPO fieldMeasurement
- WIPO sectorInstruments
Abstract
A method for estimating incoming pollution loads during operation of a municipal wastewater treatment plant involves the step of continuously measuring the conductivity and turbidity of the raw water to be treated. The concentration of a pollutant in the raw water to be treated is estimated as a function of the measured conductivity and turbidity. The flow rate of the raw water to be treated is also continuously measured. The load of the pollutant in the raw water to be treated is estimated as a function of the estimated concentration of the pollutant and the measured flow rate. The estimated pollutant load allows adjustment of downstream treatment for eliminating the estimated total load of the pollutant.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.