System and method for reliability assessment of a power system having integrated modules
US6671634B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 27, 2001 |
| Grant date | Dec 30, 2003 |
| Priority date | — |
| Expiry date | Jul 27, 2021 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY04S40/20
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
Reliability assessment of a power system having an integrated component is provided by retrieving individual component failure rates associated with individual components of the integrated component. A failure time is modeled based on the individual component failure rates associated with individual components of the integrated component. Individual component maintenance times are retrieved associated with individual components of the integrated component. A maintenance time is modeled based on the individual component maintenance times associated with individual components of the integrated component. A reliability assessment is determined based on the interconnectivity of components of the power system, the modeled maintenance times, and the modeled failure times.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.