Flow completion system

US6681850B2 · kind B2 · utility

12Cited by
8References
22Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 18, 2003
Grant dateJan 27, 2004
Priority date
Expiry dateMar 18, 2023

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B2200/01
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A flow completion system for controlling the flow of fluid from a well bore, the flow completion system includes a tubing spool which includes a central bore that extends axially therethrough and a production outlet which communicates with the central bore. A tubing hanger includes a production bore that extends axially therethrough and a production passageway that communicates between the production bore and the production outlet and a first closure member which is positioned in the production bore above the production passageway. A first annular seal which is positioned between the tubing hanger and the central bore above the production passageway including first pressure-containing barrier between the well bore and a surrounding environment. A second closure member which is positioned in the production bore above the first closure member; and a second annular seal which is positioned between the tubing hanger and the central bore above the first seal including a second pressure-containing barrier between the well bore and the environment; and wherein both the first and the second barriers are associated with the tubing hanger.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.