Method for running up a gas turbine plant

US6694745B2 · kind B2 · utility

6Cited by
11References
13Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 16, 2002
Grant dateFeb 24, 2004
Priority date
Expiry dateMay 16, 2022

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF02C9/28
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A method for running up a gas turbine plant (1) is disclosed. In the method, a fuel (6) is injected into the combustion chamber (5) via a plurality of pilot burners (10) and premix burners (11). During the start-up and in a lower load range, the combustion chamber (5) is operated in the pilot mode, and, at a specific time point, the combustion chamber (5) is changed over from the pilot mode to the premix mode. The changeover time point from the pilot mode to the premix mode depends on a variable changeover temperature (TSWO), and this changeover temperature (TSWO) is determined from pulsations occurring in the flame of the combustion chamber (5).

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.