Method for scheduling a project to design and manufacture a multi-component assembly
US6714827B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 20, 2000 |
| Grant date | Mar 30, 2004 |
| Priority date | — |
| Expiry date | Jul 13, 2021 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A method for scheduling to design and manufacture a multi-component assembly includes identifying a project completion date, determining a tooling lead time for each of the plurality of components, determining a design completion date for each of the plurality of subassemblies, the design completion date being a function of the project completion date and the tooling lead times for each of the plurality of components, determining a design lead time for each of the plurality of components, and determining a design start date for each of the plurality of components.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.