Patent · US Expired

Maximum extended load line limit analysis for a boiling water nuclear reactor

US6721383B2 · kind B2 · utility

7Cited by
9References
12Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 14, 2001
Grant dateApr 13, 2004
Priority date
Expiry dateDec 14, 2021

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E30/30
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A computerized method for expanding the operating domain of a boiling water nuclear reactor that permits safe operation of the reactor at core flows lower than normal operating parameters is provided. The operating domain is characterized by a map of the reactor thermal power and core flow. The computerized method includes determining by computer simulation a load line characteristic that is elevated over normal operating parameters and that increases reactor performance over normal operating parameters, performing safety evaluations by computer simulation at the elevated load line to determine compliance with safety design parameters, and performing operational evaluations by computer simulation at the elevated load line.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.