Patent · US Expired

System and method for managing work-in-process (WIP) workload within a fabrication facility

US6757577B1 · kind B1 · utility

3Cited by
7References
14Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 8, 2000
Grant dateJun 29, 2004
Priority date
Expiry dateApr 21, 2022

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/02
  • WIPO fieldControl
  • WIPO sectorInstruments

Abstract

A system and a method for managing a work-in-process (WIP) workload within a fabrication facility employ sequential processing of the work-in-process (WIP) workload within one each of a minimum of one pre-process tool, a minimum of one buffer tool and a minimum of one post-process tool. A buffer tool tolerance time is calculated predicated upon an available work-in-process (WIP) pre-process rate, an available work-in-process (WIP) buffer capacity and an available work-in-process (WIP) post process rate. The work-in-process (WIP) workload may thus be optimally processed in accord with the buffer tool tolerance time.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.