Patent · US Expired

Integration construction between a boiler and a steam turbine and method in preheating of the supply water for a steam turbine and in its control

US6813888B2 · kind B2 · utility

2Cited by
8References
5Claims
0Family size

Assignee

Inventor

Key dates

Filing dateOct 24, 2003
Grant dateNov 9, 2004
Priority date
Expiry dateOct 24, 2023

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF22D1/40
  • WIPO fieldThermal processes and apparatus
  • WIPO sectorMechanical engineering

Abstract

The present invention concerns an integration construction between a steam boiler provided with a combustion chamber and a steam turbine. The steam is conducted from the steam boiler (10) along a connector to the steam turbine (11) for rotating an electric generator (G) producing electricity. The supply water circulated via the steam boiler (10) is vaporized in vaporizer (190) located in the steam boiler (10) and superheated in a superheater (120). The supply water is conducted into the boiler through an economizer (20) acting as a heat exchanger, in which heat is transferred from the flue gases of the boiler into the supply water. The economizer (20) is provided with at least two sections, comprising at least one first economizer section (20a1) and at least one second economizer section (20a2). The supply water preheated with bled steams of the steam turbine is conducted in the steam boiler (10) further from the economizer (20) to the vaporizer and the superheater and therethrough, in the form of steam, to the steam turbine. A connector (19) leading to the economizer sections (20a1, 20a2) comprises a branch point (D1) to a by-pass connector (21) of supply water, whereby the econom…

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.