Patent · US Expired

Modular seabed processing system

US6832874B2 · kind B2 · utility

16Cited by
10References
28Claims
0Family size

Assignee

Inventors

Key dates

Filing dateFeb 18, 2003
Grant dateDec 21, 2004
Priority date
Expiry dateFeb 18, 2023

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/017
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

To install a modular seabed processing system (1) on a seabed, a monopile foundation (3) is first lowered down and driven into the seabed. A docking unit (4) is lowered towards the installed foundation (3) so that a mating clamp system (6) mounted on the docking unit is aligned with a spigot (5) on the foundation. The clamp system then clamps the spigot to fix the docking unit onto the foundation. Flowlines (2) and an electrical power connector plug (18) are connected to the docking unit. A first retrievable substantially autonomous module (8) is lowered and connected to the docking unit (4) by a multi-bored connector (10, 11) and the plug (18) on the docking unit is engaged by a corresponding socket (17) on the module. Isolation valves (14, 16) in the docking unit and module are opened so that the module (8) is able to act on fluid received from the flowlines (2) via the multi-bored connector (10, 11). A second retrievable substantially autonomous module is also connected to the docking unit (4) in the same way.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.