Patent · US Expired

Wireless downwhole measurement and control for optimizing gas lift well and field performance

US6840317B2 · kind B2 · utility

33Cited by
95References
31Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 2, 2001
Grant dateJan 11, 2005
Priority date
Expiry dateMar 13, 2021

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B47/16
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for optimizing the production of a petroleum well is provided. The petroleum well includes a borehole, a piping structure positioned within the borehole, and a tubing string positioned within the borehole for conveying a production fluid. Production of the well is optimized by determining a flow rate of the production fluid within the tubing string and determining a lift-gas injection rate for the gas being injected into the tubing string. The flow rate and injection rate data is communicated along the piping structure of the well to a selected location, where the data is collected and analyzed. After analysis of the data, an optimum operating point for the well can be determined.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.