Patent · US Expired

Method and system for planning disassembly and production of recyclable products and for planning procurement of parts for production

US6856857B2 · kind B2 · utility

3Cited by
4References
10Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 23, 2003
Grant dateFeb 15, 2005
Priority date
Expiry dateDec 23, 2023

Classification

  • Technology area (CPC B)Performing Operations; Transporting
  • CPC primaryB29B2017/0089
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A system and method for generating disassembly, procurement and production plans dealing with recyclable parts and products are provided. Production demand information on products to be manufactured, collection schedule information on individual used products and recyclable part table on recyclable parts contained in the used products are stored in memory; recyclable part availability information is generated by referring to the collection schedule information and the recyclable part table; and by referring to the production demand information and the recyclable part availability information, a disassembly plan on the recyclable parts is created based on the production demand. Further, the production demand information and the recyclable part availability information are referenced to generate a procurement plan on parts and materials that cannot be fully supplied from available, recyclable parts alone. Based on the disassembly and procurement plans, a production plan is created.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.