Patent · US Expired

Method and device for regulating the flow rate of formation fluids produced by an oil well

US6868910B2 · kind B2 · utility

5Cited by
8References
9Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 27, 2001
Grant dateMar 22, 2005
Priority date
Expiry dateApr 27, 2021

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/14
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

The present invention relates to a method of regulating the flow rate of formation fluids produced from a determined zone of an underground well whose cased wall is provided with orifices through which said formation fluids can pass, said method consisting in applying a tubular structure along the casing in said zone, which tubular structure prevents the fluids from flowing directly while also preserving a flow path along which the fluids can flow via the annular space outside the tubular structure so as to generate head loss. The invention also relates to a device for implementing said method, which device is essentially constituted by a radially-expandable tubular structure that can be applied against the inside wall of the casing, the structure being provided with means for preserving the flow of the fluids via a path running along the casing and along the structure, in order to generate head loss.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.