Balancing work release based on both demand and supply variables
US6892106B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 21, 2003 |
| Grant date | May 10, 2005 |
| Priority date | — |
| Expiry date | Mar 21, 2023 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/087
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A systematic approach for generating a work release plan that considers both demand and supply variables. The approach comprises prioritizing scheduled lots in order of their critical ratios, estimating an initial daily release quota for the scheduled lots based on both pull and push requirements, and determining detailed capacity constraints for the manufacturing system. The approach further comprises testing whether the initial daily release quota complies with the detailed capacity constraints, and, if the detailed capacity constraints are violated, rearranging the lots in the initial daily release quota so that the detailed capacity constraints are met.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.