Patent · US Expired

Predictive and preemptive planning and scheduling for different job priorities system and method

US6895292B2 · kind B2 · utility

20Cited by
11References
23Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 28, 2003
Grant dateMay 17, 2005
Priority date
Expiry dateApr 28, 2023

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/80
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

For an automated manufacturing system having a number of modules with numerous alternative capabilities, a computer-controlled system provides for configuration-specific reprioritization of jobs. The computer-controlled system includes at least one system controller for planning and scheduling utilization of selected module capabilities in the production of jobs having not less than one work unit. Module capabilities include the relative costs of the module capabilities.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.