Multi-tier material requirements flowdown generation

US6904440B2 · kind B2 · utility

1Cited by
4References
11Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 23, 2002
Grant dateJun 7, 2005
Priority date
Expiry dateAug 3, 2023

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10S707/99948
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A method of producing a master sub-tier schedule for a Multi-tier Manufacturing Requirements Planning (MRP) system comprising the steps of populating a database with a plurality of identified part/supplier combinations for at least one finished part, populating the database with a plurality of sub-process steps associated with each of the at least one finished part, populating the database with at least one supplier responsible for each of the plurality of sub-process steps, populating the database with at least one lead time and at least one lot requirement associated with each of the plurality of sub-process steps, and sending notification to the primary consumer and the first tier supplier if necessitated by the reviewing of the master sub-tier schedule.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.