Post construction alignment and anchoring system and method for buildings
US6931805B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Feb 20, 2003 |
| Grant date | Aug 23, 2005 |
| Priority date | — |
| Expiry date | Feb 20, 2023 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE02D37/00
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method for moving a wall from a first position to a second position and anchoring the wall in the second position, according to which a portion of an elongated assembly is placed through an opening in the wall. An auger is provided on one end portion of the assembly and torque is applied to the assembly to cause the auger to penetrate the ground, and a nut is advanced along the assembly to engage the wall and force the wall from the first position to the second position.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.