Patent · US Expired

Arrangements to detect and respond to disturbances in electrical power systems

US6941233B2 · kind B2 · utility

5Cited by
3References
5Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 18, 2003
Grant dateSep 6, 2005
Priority date
Expiry dateOct 21, 2023

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH02H3/44
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

A control arrangement and method is provided for detecting and responding to disturbances in electrical power systems. In a preferred arrangement, an integration is initiated that is based on a comparison of actual voltage of a source and a reference voltage. When the integration exceeds a predetermined value, the source is considered unreliable. Also in a preferred arrangement, a determination is made as to whether or not the disturbance is a downstream fault condition. For example, this is useful for applications where a transfer is made from a first source to a second source when predetermined disturbances are detected. In this manner, the transfer of the load to a second source is avoided which would continue the supply of the downstream fault. Additionally, the arrangement distinguishes between various degrees of disturbances to permit appropriate response based on the severity and type of disturbance. For example, a first immediate response, i.e. without intentional delay, is provided for more severe disturbances while a second delayed response is provided for less severe disturbances. The control arrangements transfers the load to an alternate source of power via the use of …

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.