Patent · US Expired

Integration construction between a boiler and a steam turbine and method in preheating of the supply water for a steam turbine and in its control

US6951106B2 · kind B2 · utility

1Cited by
9References
4Claims
0Family size

Assignee

Inventor

Key dates

Filing dateJan 2, 2001
Grant dateOct 4, 2005
Priority date
Expiry dateJan 2, 2021

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF22D1/40
  • WIPO fieldThermal processes and apparatus
  • WIPO sectorMechanical engineering

Abstract

The present invention concerns an integration construction between a steam boiler provided with a combustion chamber and a steam turbine. The steam is conducted from the steam boiler (10) along a connector to the steam turbine (11) for rotating an electric generator (K) producing electricity. The supply water circulated via the steam boiler (10) is vaporized in a vaporizer (190) located in the steam boiler (10) and superheated in a superheater (120). The supply water is conducted into the boiler through an economizer (20) acting as a heat exchanger, where heat is transferred from the flue gases of the boiler into the supply water. The economizer (20) is provided with at least two sections, comprising at least one first economizer section (20a1) and at least one second economizer section (20a2). The supply water is conducted from the first economizer section (20a1) to a supply water preheater formed from a heat exchanger (14), where thermal energy is transferred from bled steams of the steam turbine either directly or via a medium, advantageously water, into the supply water. The supply water preheated with bled steams of the steam turbine is conducted in the steam boiler (10) to th…