Gas turbine and operation method of gas turbine combined electric generating plant, gas turbine combined electric generating plant, and computer product
US6957541B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 13, 2002 |
| Grant date | Oct 25, 2005 |
| Priority date | — |
| Expiry date | Sep 13, 2022 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E20/16
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
A casing air temperature Ta and a steam temperature Ts are measured, and if an absolute value ΔT of a difference between these two temperatures is within a predetermined temperature, the gas turbine is connected to the generator. After the connection is done, the load is gradually increased, and the coolant changeover signal is sent from a processor to a controller. The coolant is then changed to the steam, thereby completing the connection of the gas turbine with the generator and the changeover of the coolant.